C-EPS Assembly Line: Run-In Tester

Run-In Tester

Machine Function:

Runs in the worm wheel and worm at the specified torque, followed by installation of the wiring harness assembly.

Process Parameters:

1. Maximum worm drive torque: 10 N·m.

2. Maximum output-end drive torque: 60 N·m.

C-EPS Assembly Line: Run-In Tester · 1
C-EPS Assembly Line: Run-In Tester · 2